FANDOM



Center of Hydrotechnic Works Initial

The Center of Hydrotechnic Works is an infrastructure structure located on the south of the atoll of Archipelago expansion zone. It was originally introduced on September 04, 2015 as part of the timed quest called Lost Treasure.[1]

A total of 10 assets are needed to complete construction of the Center of Hydrotechnic Works. This is equivalent to 10 Megabucks sm if one were to buy every asset instead of waiting to receive them from neighbors.


Events and Achievements

Requirements

Center of Hydrotechnic Works (Level 1)

Center of Hydrotechnic Works L1
Requires Rewards
  • 10 Megabucks sm or 10 asset gifts
  • Power sm and Water sm
  • 60,000 Population Limits population cap (Total: 96,500 Population Limits)
  • 3,000 Experience sm when the last asset is placed
  • 6,800 Coin sm and 150 Experience sm every 6 hours
    Coins per Minute: 18.89 Coin sm
    XP per Minute: 0.42 Experience sm
  • Access to Reinforcing the Shoreline contract at the Reclamation Department
  • Can be sold for 123,000 Coin sm
Asset Image Amount Price Cost
GeotextilesAsset Geotextiles 5x1 Megabucks sm5 Megabucks sm
Polymer PipesAsset Polymer Pipes 5x1 Megabucks sm5 Megabucks sm


Trivia

SQ Internal Info:
  • Name: Центр гидротехнических работ (translates to Center for engineering works)
  • ID: 10020048 (center_hydraulic_works_place)

References

  1. SQ Forum: Update 09.04.2015

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.