Fandom

Megapolis Wiki

Coastal Hotel (Quest)

2,307pages on
this wiki
Add New Page
Comments0 Share

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.

This page is for the timed quest "Coastal Hotel"

For the Fixed Megapolis region building, see Coastal Hotel (Building).
For the site on Tourist Island, see Coastal Hotels.
For other uses see, see Coastal Hotel.



Quest Basis of tourism Quest First visitors Quest First floors Quest Finishing operations Quest The beginning of the season Quest Everything for your vacation! Quest Spa Treatments Quest For those who expect the best
Basis of tourism First visitors First floors Finishing operations The beginning of the season Everything for your vacation! Spa Treatments For those who expect the best


Coastal Hotel (Quest) Art


Coastal Hotel (Quest)
Quest Coastal Hotel (Quest)
Objective(s)

Build and Upgrade:

Reward(s)

Coastal Hotel is a Timed Quest in which the player has 192 hours to build and upgrade a total of 1 area with assets leading up to the Coastal Hotel. It was released as part of an update on 04.23.2013.[1]


Develop tourism in Megapolis! Build a Coastal Hotel! Attract tourists and send them on excursions! The more places of interest the tourists visit, the greater the reward!

A new Visa Center will be opening soon in Megapolis. Experts guarantee it will increase the flow of tourists, including international visitors, if suitable tourist infrastructure is set up for them.

The residents beg the mayor:

Build a Coastal Hotel

Tour operators have begun developing future itineraries. The project design of the Coastal Hotel is all ready. All that’s left now is to build it!


Requirements

Info-256
TIP
Depending on how one plays the game, this quest may require approximately 650 15px-Megabucks_sm.png total (for 540 assets) and 745,000 15px-Coin_sm.png (for building and foundation purchases) to complete fully.


Stage 1 - Basis of tourism

Your city will become much more attractive to tourists if a Visa Center is opened. It needs more updated computers!

Tasks:

Construct a Visa Center and equip the work places with updated Laptops. Automating their work will increase the flow of tourists in Megapolis.
Infrastructure Visa Center Build a Visa Center
Costs: 65,000 15px-Coin_sm.png or 15px-Megabucks_sm.png , 15 15px-Power_sm.png and 11 15px-Water_sm.png
Gives: 270 15px-Experience_sm.png and 4,000 22px-Population_Limits.png upon completion
Contract Laptops Complete the Laptops contract at the Assembly Line
Costs: 750 15px-Coin_sm.png and 15 hours
Gives: 10,900 15px-Coin_sm.png and 92 15px-Experience_sm.png

Rewards:

Excellent! Not only has the Visa Center begun operating, but the tour operators have already sold out the trips. Soon Megapolis will become a center of world tourism!
  • 100 15px-Experience_sm.png
  • 1,000 15px-Coin_sm.png

Stage 2 - First visitors

We don’t have enough time to build a Coastal Hotel before the first tourists arrive! What you need to do is build a Hotel that is not so grandiose, but at the same level of comfort.

Tasks:

The Coastal Hotel project is too large of scale. There’s no way it’ll get done by the time the first tourists arrive. What you need is a Hotel that’s a little smaller and the workers to build it.
Residents Raise the population by 500 22px-Population_sm.png people
Building Cassiopeia Hotel Build Cassiopeia Hotel
Costs: 530,000 15px-Coin_sm.png , 28 15px-Power_sm.png and 20 15px-Water_sm.png
Gives: 650 15px-Experience_sm.png upcon completion, then 250 22px-Population_sm.png and 45 15px-Experience_sm.png every 8 hours

Rewards:

Cassiopeia Hotel has well exceeded expectations! With time, it will become an exclusive vacation resort for those who prefer to avoid huge tourist centers.
  • 150 15px-Experience_sm.png
  • 3,000 15px-Coin_sm.png

Stage 3 - First floors

The Coastal Hotel project is approved. Construction may begin immediately! Don’t forget to order Fresh Vegetables for your employees—vitamins are necessary when doing physical labor.

Tasks:

Begin building the Coastal Hotel. Purchase Fresh Vegetables for your workers—they need them.
Coastal Hotel Construction Lay the Foundation for the (buy the) Coastal Hotel (Building)
Costs: 150,000 15px-Coin_sm.png or 15px-Megabucks_sm.png , 25 15px-Power_sm.png and 15 15px-Water_sm.png
Gives: 350 15px-Experience_sm.png and 5,000 22px-Population_Limits.png cap increase
Contract Fresh Vegetables Complete the Fresh Vegetables contract at the Household Goods Store
Costs: 15 15px-Coin_sm.png and 5 minutes
Gives: 350 15px-Coin_sm.png and 15px-Experience_sm.png

Rewards:

Excellent! The Coastal Hotel’s construction is at full pelt and it will be ready to open come tourist season!
  • 300 15px-Experience_sm.png
  • 5,000 15px-Coin_sm.png

Stage 4 - Finishing operations

The Frame of the Coastal Hotel is ready. It’s time to build the walls and overlaps, decorate the facility, and purchase Furniture.

Tasks:

Resume construction of the Coastal Hotel. And don’t forget about the Furniture contract. It should be brought in as soon as the construction work is done.
Coastal Hotel L1 Resume construction of the Coastal Hotel Frame (Level 1)
Costs:
10 x LEDs Asset LEDs
10 x Paint Asset Paint
10 x Polyurethane Asset Polyurethane
10 x Granite Slabs Asset Granite Slabs
10 x Concrete Mixer Asset Concrete Mixer
10 x Tech Drawing Asset Tech Drawing
10 x Iron Beams Asset Iron Beams
10 x Concrete Blocks Asset Concrete Blocks
Gives: 450 15px-Experience_sm.png and 25,000 22px-Population_Limits.png cap increase upon completion
Contract Bedroom Furniture Complete the Bedroom Furniture contract at the Household Goods Facility
Costs: 1,600 15px-Coin_sm.png and 7 hours
Gives: 6,700 15px-Coin_sm.png and 49 15px-Experience_sm.png

Rewards:

The hotel will be opening very soon! You’ve already constructed a building and purchased furniture. All you have to do now is polish it up!
  • 350 15px-Experience_sm.png
  • 7,000 15px-Coin_sm.png

Stage 5 - The beginning of the season

The premium guest Plane is on its way soon! Now you need to make the finishing touches in preparing the Coastal Hotel and devise a program for the tourists.

Tasks:

The time has come to finish building a top Coastal Hotel and organize a sightseeing tour for distinguished guests!
Coastal Hotel L2 Complete construction of the Coastal Hotel (Level 2)
Costs:
10 x Escalators Asset Escalators
10 x Aerator Asset Aerator
15 x Plasma Panels Asset Plasma Panels
15 x Beach Umbrellas Asset Beach Umbrellas
10 x Towels Asset Towels
15 x Curb Asset Curb
10 x Sand Asset Sand
15 x Springboards Asset Springboards
Gives: 500 15px-Experience_sm.png and 35,000 22px-Population_Limits.png cap increase upon completion and access to Sightseeing Tour contract at the Coastal Hotel
Tour Sightseeing Tour Organize a Sightseeing Tour contract at the Coastal Hotel
Requires Coastal Hotel (Level 2)
Costs: 20,000 15px-Coin_sm.png and 3x3 hours
Gives: 37,600 15px-Coin_sm.png and 105 15px-Experience_sm.png

Rewards:

Magnificent! You’ve built a Coastal Hotel for premium guests and managed to organize city tours for them!
  • 350 15px-Experience_sm.png
  • 8,000 15px-Coin_sm.png

Zanzibar Swimming Pool

Zanzibar Swimming Pool Requires:
  • Plot 2x3
  • 15px-Power_sm.png and 16 15px-Water_sm.png

Gives:

  • 220 15px-Experience_sm.png and 25,000 22px-Population_Limits.png cap increase
  • Can be sold for 130,000 15px-Coin_sm.png

Stage 6 - Everything for your vacation!

Tasks:

Build a Recreational Center and organize a photo tour throughout Megapolis!
Coastal Hotel L3 Build a Recreational Center (Level 3)
Costs:
10 x First-Aid Kit Asset First-Aid Kit
10 x Flagpole Asset Flagpole
15 x Sun Loungers Asset Sun Loungers
10 x Fitness Equipment Asset Fitness Equipment
10 x Searchlight Asset Searchlight
15 x Plastic Windows Asset Plastic Windows
15 x Volleyballs Asset Volleyballs
10 x Turf Asset Turf
15 x Plasma Panels Asset Plasma Panels
10 x Glass Asset Glass
Gives: 575 15px-Experience_sm.png and 30,000 22px-Population_Limits.png cap increase upon completion and access to Photo Tour contract at the Coastal Hotel
Tour Photo Tour Organize a Photo Tour contract at the Coastal Hotel
Requires Recreational Center (Level 3)
Costs: 32,500 15px-Coin_sm.png and 4x4 hours
Gives: 79,950 15px-Coin_sm.png and 160 15px-Experience_sm.png

Rewards:

Excellent! You’ve constructed a Recreational Center and begun conducting city photo tours!
  • 375 15px-Experience_sm.png
  • 9,000 15px-Coin_sm.png

Stage 7 - Spa Treatments

Many ladies prefer Spa Resorts not only to relax, but also to tend to their beauty.

Tasks:

Build a Spa and begin conducting exclusive tours around Megapolis!
Coastal Hotel L4 Build a Spa (Level 4)
Costs:
10 x Vase Asset Vase
10 x Aquarium Equipment Asset Aquarium Equipment
15 x Mirrors Asset Mirrors
10 x Lawn Trellises Asset Lawn Trellises
10 x Palm Trees Asset Palm Trees
15 x Insulation Foam Asset Insulation Foam
15 x Column Asset Column
10 x Tiles Asset Tiles
15 x Diesel Generator Asset Diesel Generator
10 x Turf Asset Turf
Gives: 575 15px-Experience_sm.png and 30,000 22px-Population_Limits.png cap increase upon completion and access to Exclusive Tour contract at the Coastal Hotel
Tour Exclusive Tour Conduct an Exclusive Tour contract at the Coastal Hotel
Requires Spa (Level 4)
Costs: 50,000 15px-Coin_sm.png and 5x5 hours
Gives: 149,000 15px-Coin_sm.png and 225 15px-Experience_sm.png

Rewards:

Brilliant! The Coastal Hotel can accommodate even more premium guests and you have begun taking people on an exclusive tour around your city!
  • 400 15px-Experience_sm.png
  • 10,000 15px-Coin_sm.png

Stage 8 - For those who expect the best

Tasks:

Build a Premium Center and start conducting Premium Tours around the city for anyone who is interested!
Coastal Hotel Build a Premium Center (Level 5)
Costs:
10 x Precious Wood Furniture Asset Precious Wood Furniture
10 x Air Conditioning System Asset Air Conditioning System
15 x Express Elevator Asset Express Elevator
10 x Water Heater Asset Water Heater
10 x Mirrors Asset Mirrors
15 x Brazilian Marble Asset Brazilian Marble
15 x Gold Leaf Asset Gold Leaf
10 x Jet Ski Asset Jet Ski
15 x Glass Asset Glass
10 x Turf Asset Turf
Gives: 575 15px-Experience_sm.png and 30,000 22px-Population_Limits.png cap increase upon completion and access to Premium Tour contract at the Coastal Hotel
Tour Premium Tour Start a Premium Tour contract at the Coastal Hotel
Requires Premium Center (Level 5)
Costs: 65,000 15px-Coin_sm.png and 6x6 hours
Gives: 217,750 15px-Coin_sm.png and 300 15px-Experience_sm.png

Rewards:

Tremendous! You’ve successfully constructed a Premium Center and started conducting Premium Tours of Megapolis!
  • 500 15px-Experience_sm.png
  • 15,000 15px-Coin_sm.png
  • 1 x Grosvenor Hotel (see below)

Reward - Coastal Hotel (Quest)

Grosvenor Hotel Grosvenor Hotel
Requires:
  • Plot 2x3
  • 60 15px-Power_sm.png and 52 15px-Water_sm.png
Gives:
  • 750 15px-Experience_sm.png and 44,000 22px-Population_Limits.png
  • 6,100 15px-Coin_sm.png and 130 15px-Experience_sm.png every 10 hours
  • Can be sold for 300,000 15px-Coin_sm.png


Achievement after building and upgrading the Coastal Hotel

Achievement Leading Tour Operator Excellent work! Now you can be considered a true expert in tourism! You receive the rank of “Leading Tour Operator”.
  • 500 15px-Experience_sm.png
  • 15,000 15px-Coin_sm.png


Trivia

  • ENTER any trivia about the quest here.
  • Social Quantum's internal name for this quest is "Береговой отель".
  • Social Quantum's ID for this quest is 70211.

References

  1. SQ Forum: Update 04.23.2013

Also on Fandom

Random Wiki