FANDOM


"Build and upgrade the plant to assemble models of drilling machines."

The Drilling Machine Assembly Plant is a spaceport factory located west of Seaside. It was originally introduced on February 09, 2017.[1]

A total of 120 assets and additional 410,000 Coin sm worth diagrams are needed to complete construction of the Drilling Machine Assembly Plant. This is equivalent to 125 Megabucks sm if one were to buy every asset instead of waiting to receive them from neighbors.

Requirements


Gallery

Assets

Level 1 Drilling Machine Assembly Plant

Asset Image Amount Price Cost
Automated Barrier GateAsset Automated Barrier Gate 5xMegabucks smMegabucks sm
BracketsAsset Brackets 5xMegabucks smMegabucks sm
ChannelAsset Channel 10xMegabucks sm10 Megabucks sm
Simple DiagramAsset Simple Diagram 1x60,000 Coin sm60,000 Coin sm
20 Assets
1 Diagram
20 Megabucks sm
60,000 Coin sm

Level 2 Drilling Machine Assembly Plant

Requirements: Completion of Registering Volcanic Activity mission

Asset Image Amount Price Cost
Communication WiresAsset Communication Wires 12xMegabucks sm12 Megabucks sm
Clay BricksAsset Clay Bricks 12xMegabucks sm12 Megabucks sm
Measure and Control SystemsAsset Measure and Control Systems 5xMegabucks sm10 Megabucks sm
ProjectorAsset Projector 11xMegabucks sm11 Megabucks sm
Standard DiagramAsset Standard Diagram 1x100,000 Coin sm100,000 Coin sm
40 Assets
1 Diagram
45 Megabucks sm
100,000 Coin sm

Level 3 Drilling Machine Assembly Plant

Requirements: Completion of Detecting a Magnetic Anomaly mission

Asset Image Amount Price Cost
Crushed GraniteAsset Crushed Granite 13xMegabucks sm13 Megabucks sm
Detailed DiagramAsset Detailed Diagram 1x250,000 Coin sm250,000 Coin sm
PaintAsset Paint 10xMegabucks sm10 Megabucks sm
Painting EquipmentAsset Painting Equipment 10xMegabucks sm10 Megabucks sm
Steam RollerAsset Steam Roller 16xMegabucks sm16 Megabucks sm
WindlassAsset Windlass 11xMegabucks sm11 Megabucks sm
60 Assets
1 Diagram
60 Megabucks sm
250,000 Coin sm

Assembly Contracts

Drilling Machine Assembly Plant: Contracts
Name Prototype Tiles Time XP Experience sm Requirements
TBM-11 Drilling Machine L0
TBM-11 Drilling Machine
TBM-11 Engine
TBM-11 Engine
+
TBM-11 Loading Bucket
TBM-11 Loading Bucket
+
TBM-11 Drillbit
TBM-11 Drillbit
+
TBM-11 Track Gear
TBM-11 Track Gear
40,000 Coin sm
30 minutes
70 Experience sm
  • Level 1 Drilling Machine Assembly Plant
  • Production of all prototype tiles
  • Launch Tunnel
TBM-23 Drilling Machine L0
TBM-23 Drilling Machine
TBM-23 Engine
TBM-23 Engine
+
TBM-23 Loading Bucket
TBM-23 Loading Bucket
+
TBM-23 Drillbit
TBM-23 Drillbit
+
TBM-23 Track Gear
TBM-23 Track Gear
45,000 Coin sm
1 hour
135 Experience sm
  • Level 1 Drilling Machine Assembly Plant
  • Production of all prototype tiles
  • Launch Tunnel
TBM-31 Drilling Machine L0
TBM-31 Drilling Machine
TBM-31 Engine
TBM-31 Engine
+
TBM-31 Loading Bucket
TBM-31 Loading Bucket
+
TBM-31 Drillbit
TBM-31 Drillbit
+
TBM-31 Track Gear
TBM-31 Track Gear
85,000 Coin sm
1 hour and 30 minutes
225 Experience sm
  • Level 2 Drilling Machine Assembly Plant
  • Production of all prototype tiles
  • Launch Tunnel
TBM-45 Drilling Machine L0
TBM-45 Drilling Machine
TBM-45 Engine
TBM-45 Engine
+
TBM-45 Loading Bucket
TBM-45 Loading Bucket
+
TBM-45 Drillbit
TBM-45 Drillbit
+
TBM-45 Track Gear
TBM-45 Track Gear
90,000 Coin sm
2 hours
265 Experience sm
  • Level 2 Drilling Machine Assembly Plant
  • Production of all prototype tiles
  • Launch Tunnel
TBM-56 Drilling Machine L0
TBM-56 Drilling Machine
TBM-56 Engine
TBM-56 Engine
+
TBM-56 Loading Bucket
TBM-56 Loading Bucket
+
TBM-56 Drillbit
TBM-56 Drillbit
+
TBM-56 Track Gear
TBM-56 Track Gear
125,000 Coin sm
2 hours 30 minutes
325 Experience sm
  • Level 3 Drilling Machine Assembly Plant
  • Production of all prototype tiles
  • Launch Tunnel
TBM-68 Drilling Machine L0
TBM-68 Drilling Machine
TBM-68 Engine
TBM-68 Engine
+
TBM-68 Loading Bucket
TBM-68 Loading Bucket
+
TBM-68 Drillbit
TBM-68 Drillbit
+
TBM-68 Track Gear
TBM-68 Track Gear
140,000 Coin sm
3 hours
365 Experience sm
  • Level 3 Drilling Machine Assembly Plant
  • Production of all prototype tiles
  • Launch Tunnel

Data

Level XP Power Water Additional Access
0 350 Experience sm Power sm
(+8)
Water sm
(+6)
1 550 Experience sm 20 Power sm
(+12)
14 Water sm
(+8)
  • Access to TBM-11 Drilling Machine and TBM-23 Drilling Machine contracts above
2 750 Experience sm 36 Power sm
(+16)
24 Water sm
(+10)
  • Access to TBM-31 Drilling Machine and TBM-45 Drilling Machine contracts above
3 950 Experience sm 56 Power sm
(+20)
36 Water sm
(+12)
  • Access to TBM-56 Drilling Machine and TBM-68 Drilling Machine contracts above
Total/Max 2,600 Experience sm 56 Power sm 36 Water sm

Trivia

SQ Internal Info:
  • Name: Сборочный завод бурильных машин (translates to Assembly Plant drilling machines)
  • ID: 10101880 (bm_assembly_factory_place)

References

  1. SQ Forum: Update 02.09.2017

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.