The Everest Bridge is an Industrial Complex bridge that connects the Gold Plateau expansion zone with the Coastal Valley. It was originally introduced on Wed July 15, 2015.[1]
A total of 170 assets are needed to complete construction of the Everest Bridge. This is equivalent to 170 if one were to buy every asset instead of waiting to receive them from neighbors.
Events and Achievements[]
- See Industrial Complex for all related Achievements
Requirements[]
- Level 45
- Completion of building the Kutang Bridge or Montblanc Bridge or Diamir Bridge
Everest Bridge (Level 1)[]
Requires | Rewards |
---|---|
|
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Bridge Truss | 15x | 1 | 15 | |
Concrete Blocks | 18x | 1 | 18 | |
Drainage Device | 20x | 1 | 20 | |
Loudspeaker | 17x | 1 | 17 | |
Metal-Cutting Machine | 20x | 1 | 20 | |
Painting Equipment | 15x | 1 | 15 | |
Perforator Drill | 16x | 1 | 16 | |
Span Superstructures | 16x | 1 | 16 | |
Steel Cable | 15x | 1 | 15 | |
Supports | 18x | 1 | 18 |
Trivia[]
- SQ Internal Info:
- Name: Мост “Эверест” (translates to Bridge “Everest”)
- ID: 23209 (bridge_everest_place)