On the Right Course is a Timed Quest in which the player has 192 hours to build and upgrade a total of 4 new fixed structures with assets leading to exclusive rewards. It was released as part of an update on Mon November 16, 2015.[1] The event also provides for World Architecture: Brazil.
"Revive Iguazu Falls!? Is it even possible? Water engineers claim that they've found a way to change the river's course and fill Iguazu Falls with water again." |
|
"The residents are asking the mayor to: revive Iguazu Falls" | |
"Build the Water Engineering Base and Galour Hotel, turn Iguazu Falls into a tourist center and get a new title and gifts!" |
Requirements
Tips |
---|
No tips available at this moment!
|
Stage 1 - Forgotten Falls[]
Only fifty years ago, Iguazu Falls was a wonder of nature, but right now it's just a dry crevice – the river that fed the falls changed its course and Iguazu dried out. It's time to bring it back to life!
Tasks:
- Start building the Water Engineering Base. You'll need it to put the river on its rightful course and reawaken the falls!
Lay the Water Engineering Base Foundation |
Rewards:
- The wheels are in motion – soon the first streams will start to flow along the old river course! As a reward, you receive materials. You can find them in your Storehouse. Use them!
- 300
- 700
- 05 x Flexible Hoses
Stage 2 - First Drops[]
Water engineers must clear the old river's channel so that the river can flow once more to the falls. Incidentally, your project has drawn the attention of Megapolis's residents – prepare for an influx of tourists!
Tasks:
- Build the Water Engineering Base and start building the Iguazu Hospitality Service.
Build the Water Engineering Base
| ||
Lay the Iguazu Hospitality Service Foundation |
Rewards:
- Well done! Your specialists are ready to start making the old river bed deeper! Want to share this news with your friends?
Stage 3 - Hospitality Above All[]
The curious residents of Megapolis are already rushing out of the city to take a look at the newly revived waterfall. It looks like it's time to take care of some tourist infrastructure!
Tasks:
- Build the Iguazu Hospitality Service and lay some pulp pipe to transport soil to the future dam.
Build the Iguazu Hospitality Service
| ||
Accept the Laying Pulp Pipe contract
|
Rewards:
- Great! Your project has inspired people so much that they're collecting money for materials, buying them up and sending them to your Storehouse!
- 410
- 1,800
- 10 x Concrete Blocks
Stage 4 - Hydraulic Shock[]
A famous Megapolis architect has proposed a hotel project right in the center of Iguazu! It's a profitable idea that can be easily made real!
Tasks:
- Build the Water Engineering Center and start preparing infrastructure for the Galour Hotel.
Build the Water Engineering Center
| ||
Complete the Preparing Hotel Infrastructure contract
| ||
Lay the Galour Hotel Foundation |
Rewards:
- You did it! Keep up the good work, there's still a lot left to do!
Stage 5 - In the Valley of Waterfalls[]
A hotel surrounded by waterfalls is a complicated project, but the citizens completely support you and promise to book rooms at the Galour in advance!
Tasks:
- Build the Galour Hotel and clean the soil dust out of the Iguazu's ledges.
Build the Galour Hotel
| ||
Accept the Purifying the Waterfall contract
|
Rewards:
- You did a great job on this task and you receive a gift for your troubles – the Waterfall Preservation Service is in your Storehouse! Hurry and build it!
Stage 6 - On the Right Course (Quest)[]
Your water engineers are ready to reinforce the dam and fill Iguazu with water again. And that architect has offered to build a restaurant atop one of the waterfalls!
Tasks:
- Revive Iguazu Falls and start building the Cascade Restaurant. Don't forget to ask the Galour's Head Waiter to train the staff.
Build the Water Engineering Complex
| ||
Lay the Cascade Restaurant Foundation
| ||
Complete the Head Waiter's Master Classes contract
|
Rewards:
- The waterfalls have come to life with their thundering shower once again! The citizens and tourists are elated and a new delivery of materials awaits you in the Storehouse.
- 610
- 3,900 }
- 05 x Hydro Insulation
Stage 7 - Noisy Restaurant[]
The waterfall is just like grandpa described it! Thank you! There's just a little left to do – we need to spruce the place up so tourists and citizens can come here to relax!
Tasks:
- Build the Cascade Restaurant and finish insulating the dam with geomembranes.
Build the Cascade Restaurant
| ||
Accept the Installation of Geomembranes contract
|
Rewards:
- The restaurant customers seem almost as loud as the falls! And that means they're enjoying themselves and you've done a good job!
Stage 8 - Unforgettable View[]
People come to Iguazu for the unforgettable view, but what if we make it even better? A Viewing Platform will bring even more tourists to the falls!
Tasks:
- Build a Viewing Platform and host a waterfall party in the restaurant with the best DJs in the world!
Build the Viewing Platform
| ||
Complete the Falls Party contract
|
Rewards:
- The view is breathtaking! The citizens have sent you materials again! Witness the power of crowdfunding!
- 790
- 5,800
- 10 x Pipes
Stage 9 - Waterfall Tours[]
Until now, your guests have gotten to the waterfalls under their own steam, but now you need to organize full-fledged tours. Share this natural wonder with the world!
Tasks:
- Build the Iguazu Hospitality Center and organize tours in Megapolis.
Build the Iguazu Hospitality Center
| ||
Buy the Tourism Headquarters
|
Rewards:
- Great! The hotel at the falls has become a favorite spot for citizens and the flow of tourists never runs dry!
Stage 10 - Directing Drops[]
It seems it isn't enough for your guests to watch the spray of the Iguazu – they want to go right down to it! The architect has sent a diagram for a project he calls the Spray Theater!
Tasks:
- Build the incredible Spray Theater and organize an extreme canyon tour.
Build the Spray Theater
| ||
Accept the Extreme Canyon Tour contract
|
Rewards:
- Congratulations! Now Iguazu isn't just a wonder of nature, but a wonder of the tourism industry as well!
Reward - On the Right Course[]
Natural Resources Department
|
- Achievement after building the Natural Resources Department
"You revived a magnificent natural wonder – Iguazu Falls and earned the title of Miracle Worker. Share this news with your friends!" |
Trivia[]
- Social Quantum's internal name for this quest is "В нужное русло" which translates to "In the right direction".
- Social Quantum's ID for this quest is 10080160.