Megapolis Wiki
Advertisement
Under ConstructionThis article is incomplete. Please help improve it by editing.
Tip
TIP
These quests have been deprecated and are no longer available to start.
Quest The Study of Water
 → 
Quest Preliminary Research
 → 
Quest Practical Trials
 → 
Quest Applied Hydrology
 → 
Quest Hydrology Research Institute
 → 
Quest Conserving Energy
 → 
Quest Turbine Upgrade
The Study of WaterPreliminary ResearchPractical TrialsApplied HydrologyHydrology Research InstituteConserving EnergyTurbine Upgrade


Requirements[]

The The Study of Water quest unlocks once the following conditions have been met:

  • ??

Goals[]

Copy the quest description to here
Hydrology Institute Construction Buy a Hydrology Institute foundation
Costs: 220,000 Coin sm or 2 Megabucks sm, 10 Power sm and 5 Water sm
Gives: 500 Experience sm and 5,000 Population sm cap increase
Contract Microchips Undertake a Microchip contract (at the Research Center)

Rewards[]

You're off to a great start! Once the Hydrology Institute is finished, our scientists will be able to tell us a lot about water desalination. Would you like to share the news with your friends?
  • XP Reward: 110 Experience sm
  • Coin Reward: 1,250 Coin sm

Trivia[]

  • Social Quantum's ID for this quest is 70375.
Advertisement