This page is for the timed quest "Coastal Hotel"
- For the Fixed Megapolis region building, see Coastal Hotel (Building).
- For the site on Tourist Island, see Coastal Hotels.
- For other uses see, see Coastal Hotel.
→ | → | → | → | → | → | → | ||||||||
Basis of tourism | First visitors | First floors | Finishing operations | The beginning of the season | Everything for your vacation! | Spa Treatments | For those who expect the best |
Objective(s) |
Build and Upgrade:
|
---|---|
Reward(s) |
|
Coastal Hotel is a Timed Quest in which the player has 192 hours to build and upgrade a total of 1 area with assets leading up to the Coastal Hotel. It was released as part of an update on 04.23.2013.[1]
Develop tourism in Megapolis! Build a Coastal Hotel! Attract tourists and send them on excursions! The more places of interest the tourists visit, the greater the reward!
A new Visa Center will be opening soon in Megapolis. Experts guarantee it will increase the flow of tourists, including international visitors, if suitable tourist infrastructure is set up for them.
The residents beg the mayor:
Build a Coastal Hotel
Tour operators have begun developing future itineraries. The project design of the Coastal Hotel is all ready. All that’s left now is to build it!
Requirements
TIP Depending on how one plays the game, this quest may require approximately 650 total (for 540 assets) and 745,000 (for building and foundation purchases) to complete fully. |
Stage 1 - Basis of tourism[]
Your city will become much more attractive to tourists if a Visa Center is opened. It needs more updated computers!
Tasks:
- Construct a Visa Center and equip the work places with updated Laptops. Automating their work will increase the flow of tourists in Megapolis.
Build a Visa Center | ||
Complete the Laptops contract at the Assembly Line |
Rewards:
- Excellent! Not only has the Visa Center begun operating, but the tour operators have already sold out the trips. Soon Megapolis will become a center of world tourism!
Stage 2 - First visitors[]
We don’t have enough time to build a Coastal Hotel before the first tourists arrive! What you need to do is build a Hotel that is not so grandiose, but at the same level of comfort.
Tasks:
- The Coastal Hotel project is too large of scale. There’s no way it’ll get done by the time the first tourists arrive. What you need is a Hotel that’s a little smaller and the workers to build it.
Raise the population by 500 people | ||
Build Cassiopeia Hotel |
Rewards:
- Cassiopeia Hotel has well exceeded expectations! With time, it will become an exclusive vacation resort for those who prefer to avoid huge tourist centers.
Stage 3 - First floors[]
The Coastal Hotel project is approved. Construction may begin immediately! Don’t forget to order Fresh Vegetables for your employees—vitamins are necessary when doing physical labor.
Tasks:
- Begin building the Coastal Hotel. Purchase Fresh Vegetables for your workers—they need them.
Lay the Foundation for the (buy the) Coastal Hotel (Building) | ||
Complete the Fresh Vegetables contract at the Household Goods Store |
Rewards:
- Excellent! The Coastal Hotel’s construction is at full pelt and it will be ready to open come tourist season!
Stage 4 - Finishing operations[]
The Frame of the Coastal Hotel is ready. It’s time to build the walls and overlaps, decorate the facility, and purchase Furniture.
Tasks:
- Resume construction of the Coastal Hotel. And don’t forget about the Furniture contract. It should be brought in as soon as the construction work is done.
Resume construction of the Coastal Hotel Frame (Level 1) | ||
Complete the Bedroom Furniture contract at the Household Goods Facility |
Rewards:
- The hotel will be opening very soon! You’ve already constructed a building and purchased furniture. All you have to do now is polish it up!
Stage 5 - The beginning of the season[]
The premium guest Plane is on its way soon! Now you need to make the finishing touches in preparing the Coastal Hotel and devise a program for the tourists.
Tasks:
- The time has come to finish building a top Coastal Hotel and organize a sightseeing tour for distinguished guests!
Complete construction of the Coastal Hotel (Level 2)
| ||
Organize a Sightseeing Tour contract at the Coastal Hotel
|
Rewards:
- Magnificent! You’ve built a Coastal Hotel for premium guests and managed to organize city tours for them!
Zanzibar Swimming Pool
Requires:
Gives: |
Stage 6 - Everything for your vacation![]
Tasks:
- Build a Recreational Center and organize a photo tour throughout Megapolis!
Build a Recreational Center (Level 3)
| ||
Organize a Photo Tour contract at the Coastal Hotel
|
Rewards:
- Excellent! You’ve constructed a Recreational Center and begun conducting city photo tours!
Stage 7 - Spa Treatments[]
Many ladies prefer Spa Resorts not only to relax, but also to tend to their beauty.
Tasks:
- Build a Spa and begin conducting exclusive tours around Megapolis!
Build a Spa (Level 4)
| ||
Conduct an Exclusive Tour contract at the Coastal Hotel
|
Rewards:
- Brilliant! The Coastal Hotel can accommodate even more premium guests and you have begun taking people on an exclusive tour around your city!
Stage 8 - For those who expect the best[]
Tasks:
- Build a Premium Center and start conducting Premium Tours around the city for anyone who is interested!
Build a Premium Center (Level 5)
| ||
Start a Premium Tour contract at the Coastal Hotel
|
Rewards:
- Tremendous! You’ve successfully constructed a Premium Center and started conducting Premium Tours of Megapolis!
Reward - Coastal Hotel (Quest)[]
Grosvenor Hotel |
Achievement after building and upgrading the Coastal Hotel
Excellent work! Now you can be considered a true expert in tourism! You receive the rank of “Leading Tour Operator”. |
Trivia[]
- ENTER any trivia about the quest here.
- Social Quantum's internal name for this quest is "Береговой отель".
- Social Quantum's ID for this quest is 70211.