The Project Administration Office is a production structure located on the bank of oasis south-east of Overpass Expansion Zone. It was originally introduced on Tue October 6, 2015 as part of the timed quest called Desert Oasis.[1]
A total of 105 assets are needed to complete construction of the Project Administration Office. This is equivalent to 105 if one were to buy every asset instead of waiting to receive them from neighbors.
Gallery[]
Assets[]
Project Administration Office (Level 1)[]
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Curb | 5x | 1 | 5 | |
Luminescent Lamps | 5x | 1 | 5 | |
10 Assets | 10 |
Project Administration Office: Project Headquarters (Level 2)[]
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Aluminum Profile | 12x | 1 | 12 | |
Anchor Bolts | 10x | 1 | 10 | |
Lawn Edging | 13x | 1 | 13 | |
Wire Rope | 8x | 1 | 8 | |
Geotextiles | 7x | 1 | 7 | |
Nails | 14x | 1 | 14 | |
Plastic Panels | 9x | 1 | 9 | |
Polymer Pipes | 11x | 1 | 11 | |
Tools | 11x | 1 | 11 | |
95 Assets | 95 |
Contracts[]
Project Administration Office: Contracts | ||||||||
---|---|---|---|---|---|---|---|---|
Name | Cost | Duration | Reward | XP | Coins/Minute | XP/Minute | Requirements | |
Water Sampling | 160 | 15 minutes | 720 | 7 | 37.33 | 0.47 | Project Administration Office | |
Researching the Oasis Ecosystem | 320 | 30 minutes | 1,400 | 14 | 36.00 | 0.47 | Reservoir Research Center | |
Designing a Water Supply System | 1,000 | 1 hour | 4,500 | 47 | 58.33 | 0.78 | Solar Cooling Facility | |
Starting Up the Irrigation System | 4,950 | 3 hours | 21,500 | 190 | 91.94 | 1.06 | Irrigation System | |
Project Conference[C 1] | 7,730 | 5 hours | 33,600 | 320 | 86.23 | 1.07 | Department of Water Bioresources | |
Project Commercialization | 14,200 | 7 hours | 61,800 | 550 | 113.33 | 1.31 | Climate Control Department | |
Remote Water Supply[C 2] | 17,270 | 8 hours | 75,100 | 690 | 120.48 | 1.44 | Project Headquarters | |
Oasis Camel Tour | 23,000 | 10 hours | 100,000 | 1,000 | 128.33 | 1.67 | Desert Tears Moisture Collector |
Data[]
Trivia[]
- SQ Internal Info:
- Name: Администрация проекта (translates to Administration of the project)
- ID: 10020057 (project_administration_place)