Megapolis Wiki
Advertisement


Timber Cutting Complex Initial

The Timber Cutting Complex is an industrial hub located on the eastern south east border of the Central Region expansion zone in Industrial Complex. It was originally introduced on Wed July 15, 2015 as part of the timed quest called Industrial Complex.[1]

A total of 440 assets and additional 4,250,000 Coin sm worth diagrams are needed to complete construction of the Timber Cutting Complex. This is equivalent to 460 Megabucks sm if one were to buy every asset instead of waiting to receive them from neighbors.


On Tue July 21, 2015, coin assets' values were updated as follows:

Events and Achievements[]

Requirements[]

Timber Cutting Complex: Sorting Line (Level 1)[]

Timber Cutting Complex L1
Requires Rewards
  • 110 Megabucks sm or 110 asset gifts
  • 250,000 Coin sm worth asset
  • 52 Power sm (+31) and 28 Water sm (+17)
  • 1,600 Experience sm when the last asset is placed
  • Resource Productivity: 9 Wood Wood per hour
  • Coin Productivity: 5,801 Coin sm per hour
  • Max Storage: 70 Wood Wood and 44,800 Coin sm
Asset Image Amount Price Cost
Bandsaw Asset Bandsaw 16x 1 Megabucks sm 16 Megabucks sm
Detailed Diagram Asset Detailed Diagram 1x 250,000 Coin sm 250,000 Coin sm
Logging Equipment Asset Lumbering Equipment 18x 1 Megabucks sm 18 Megabucks sm
Paint Asset Paint 19x 1 Megabucks sm 19 Megabucks sm
Pantograph Asset Pantograph 20x 1 Megabucks sm 20 Megabucks sm
Rebar Asset Rebar 17x 1 Megabucks sm 17 Megabucks sm
Tools Asset Tools 20x 1 Megabucks sm 20 Megabucks sm

Timber Cutting Complex: Circular Powersaw (Level 2)[]

Timber Cutting Complex L2
Requires Rewards
  • 160 Megabucks sm or 160 asset gifts
  • 1,000,000 Coin sm worth asset
  • 93 Power sm (+41) and 51 Water sm (+13)
  • 2,100 Experience sm when the last asset is placed
  • Resource Productivity: 25 Wood Wood per hour
  • Coin Productivity: 16,084 Coin sm per hour
  • Max Storage: 150 Wood Wood and 96,000 Coin sm
Asset Image Amount Price Cost
Adaptable Screwdriver Asset Adaptable Screwdriver 19x 1 Megabucks sm 19 Megabucks sm
Assembly Diagram Asset Assembly Diagram 2x 500,000 Coin sm 1,000,000 Coin sm
Construction Adhesive Asset Construction Adhesive 17x 1 Megabucks sm 17 Megabucks sm
Construction Netting Asset Construction Netting 16x 1 Megabucks sm 16 Megabucks sm
Crushed Granite Asset Crushed Granite 18x 1 Megabucks sm 18 Megabucks sm
Lighting Equipment Asset Lighting Equipment 18x 1 Megabucks sm 18 Megabucks sm
Power Outlet Asset Socket 19x 1 Megabucks sm 19 Megabucks sm
Technical Drawing Asset Tech Drawing 20x 1 Megabucks sm 20 Megabucks sm
Turnstiles Asset Turnstiles 16x 1 Megabucks sm 16 Megabucks sm
Ball Valve Asset Valve (Industrial) 17x 1 Megabucks sm 17 Megabucks sm

Timber Cutting Complex: Timber Storage Warehouse (Level 3)[]

Timber Cutting Complex L3
Requires Rewards
  • 190 Megabucks sm or 170 asset gifts
  • 3,000,000 Coin sm worth asset
  • 144 Power sm (+51) and 80 Water sm (+29)
  • 2,700 Experience sm when the last asset is placed
  • Resource Productivity: 42 Wood Wood per hour
  • Coin Productivity: 26,895 Coin sm per hour
  • Max Storage: 200 Wood Wood and 128,000 Coin sm
Asset Image Amount Price Cost
Concrete Slabs Asset Concrete Slabs 20x 1 Megabucks sm 20 Megabucks sm
Electric Planer Asset Electric Plane 20x 2 Megabucks sm 40 Megabucks sm
Engineering Diagram Asset Engineering Diagram 3x 1,000,000 Coin sm 3,000,000 Coin sm
Claydite Asset Expanded Clay 14x 1 Megabucks sm 14 Megabucks sm
Gravel Asset Gravel 17x 1 Megabucks sm 17 Megabucks sm
Hammer Asset Hammer 15x 1 Megabucks sm 15 Megabucks sm
Holding Angle Asset Holding Angle 17x 1 Megabucks sm 17 Megabucks sm
Nails Asset Nails 16x 1 Megabucks sm 16 Megabucks sm
Scaffolding Cover Asset Scaffolding Cover 15x 1 Megabucks sm 15 Megabucks sm
Steel Chain Asset Steel Chain 18x 1 Megabucks sm 18 Megabucks sm
Stepladder Asset Stepladder 18x 1 Megabucks sm 18 Megabucks sm

Data[]

Level XP Power Water Coin Production[d 1] Resource Production[d 2] Coin Storage Resource Storage
0 1,000 Experience sm 21 Power sm
(+21)
11 Water sm
(+11)
3,850 Coin sm per hour Wood Wood per hour 38,400 Coin sm 60 Wood Wood
1 1,600 Experience sm 52 Power sm
(+31)
28 Water sm
(+17)
5,801 Coin sm per hour Wood Wood per hour 44,800 Coin sm 70 Wood Wood
2 2,100 Experience sm 93 Power sm
(+41)
51 Water sm
(+23)
16,084 Coin sm per hour 25 Wood Wood per hour 96,000 Coin sm 150 Wood Wood
3 2,700 Experience sm 144 Power sm
(+51)
80 Water sm
(+29)
26,895 Coin sm per hour 42 Wood Wood per hour 128,000 Coin sm 200 Wood Wood
Total/Max 7,400 Experience sm 144 Power sm 80 Water sm 26,895 Coin sm per hour 42 Wood Wood per hour 128,000 Coin sm 200 Wood Wood
  1. Bonus:
    Unique Building Bonus Production Rate
    Level 1 Level 2 Level 3 Level 4
    Wood Processing Factory +640 Coin sm/hour +1280 Coin sm/hour +1920 Coin sm/hour +2560 Coin sm/hour
    Geological Survey Service +640 Coin sm/hour +1280 Coin sm/hour +1920 Coin sm/hour +2560 Coin sm/hour
    Industrial Automation Bureau +640 Coin sm/hour +1280 Coin sm/hour +1920 Coin sm/hour +2560 Coin sm/hour
  2. Bonus:
    Unique Building Bonus Production Rate
    Level 1 Level 2 Level 3 Level 4
    Wood Processing Factory +1/hour +2/hour +3/hour +4/hour
    Geological Survey Service +1/hour +2/hour +3/hour +4/hour
    Industrial Automation Bureau +1/hour +2/hour +3/hour +4/hour

Trivia[]

SQ Internal Info:
  • Name: Лесозаготовительный комплекс (translates to Forestry Complex)
  • ID: 23074 (mining_wood_station_place)

References[]

Advertisement