Plot | Fixed |
Cost | 10,000 |
3 | |
15 | |
13 | |
Provides | 300 |
Population limit: | |
No periodic benefit | |
Construction | Instant |
Tunnel Entrances A-G are infrastructure buildings located to the northeast of the starting game zone, adjacent to the Airport Terminal. They were added during an update on 12.20.2013.[1] Purchase of each Tunnel Entrance along with the corresponding Service Platform enables the purchase of one Subway Train. A total of 175 assets are needed to complete construction of all seven Tunnel Entrances. This equates to 175 if one were to buy every asset instead of waiting to receive them from neighbors. Related Buildings
|
Quests and Achievements[]
Quests
- Underground Transportation (includes purchase of Tunnel Entrance A)
- A Perfect Form of Transportation (includes completion of High-Speed Subway Gate A)
Requirements[]
- Purchase of the corresponding Service Platform (A-G), which themselves require:
- Service Platform A: Completion of the Subway Administration Building (Level 1)
- Service Platforms B,C: Completion of the Electrical Substation (Level 1)
- Service Platforms D-F: Completion of the Electrical Substation Additional Transformers (Level 2)
- Service Platform G: Completion of the Electrical Substation Remote Control System (Level 3)
High-Speed Subway Gate[]
Each of the seven Tunnel Entrances can be upgraded to a High-Speed Subway Gate, providing ??.
Requires | Rewards |
---|---|
|
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Concrete Rings | x 5 | 1 | 5 | |
Tech Drawing | x 5 | 1 | 5 | |
Cement | x 5 | 1 | 5 | |
T-beam | x 5 | 1 | 5 | |
Hard Hat | x 5 | 1 | 5 |