Plot | Fixed |
Cost | 36,000 |
1 | |
7 | |
4 | |
Provides | 110 |
Population limit: | |
No periodic benefit | |
Construction | Instant |
The Gold Mining Company is a Production Building that is located in the desert, east of the starting zone. It was added during an update on 07.25.2014 as part of the timed quest called Ghost Town.[1]
A total of 115 assets are needed to complete construction of the Gold Mining Company. This is equivalent to 115 if one were to buy every asset instead of waiting to receive them from neighbors.
For extra infrastructures purchased before 12.16.2014, the data is as follows:
- For Jewelry Store: 16 , 14,700 ,
900 and 18 every 5 hours
Coin per Minute: 3
XP per Minute: 0.06 - For Jewelry Showroom: 14 , 10,600 ,
700 and 16 every 5 hours
Coin per Minute: 2.33
XP per Minute: 0.05
Quests and Achievements[]
Quests
- Timed Quest: Ghost Town
Requirements[]
Contracts[]
Gold Mining Company: Contracts | ||||||||
---|---|---|---|---|---|---|---|---|
Name | Cost | Duration | Reward | XP | Coins/Minute | XP/Minute | Requirements | |
Planning Geological Survey Operations | 1,300 | 30 minutes | 2,400 | 35 | 36.67 | 1.17 | Gold Mining Company (Level 1) | |
Finding Deposits | 2,700 | 1 hour | 5,100 | 75 | 40.00 | 1.25 | Jewelry Showroom | |
Mining Gold Ore | 4,800 | 2 hours | 10,800 | 155 | 50.00 | 1.29 | Gold Mine (Level 2) | |
Researching Gold Refining Methods | 6,100 | 6 hours | 26,600 | 480 | 56.94 | 1.33 | Wind Turbines System (Level 1) | |
Doubling Gold Production Capacity | 5,300 | 4 hours | 23,000 | 340 | 73.75 | 1.42 | Autonomous Water Station (Level 1) | |
Studying Jewelworking[C 1] | 10,900 | 8 hours | 51,200 | 700 | 83.96 | 1.46 | Gold Mine (Level 2) | |
Refining Gold Ore | 11,500 | 10 hours | 65,000 | 900 | 89.17 | 1.50 | Gold Refinery (Level 2) | |
Gold Museum Tour[C 2] | 10,600 | 12 hours | 75,300 | 1,200 | 89.86 | 1.67 | Gold Museum |
Gold Mining Company (Level 1)[]
Requires | Rewards |
---|---|
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Crushed Granite | x 5 | 1 | 5 | |
Facade Adhesive | x 5 | 1 | 5 |
Extra Infrastructures[]
Jewelry Store | Jewelry Showroom |
---|---|
77,000 or 1 (maximum 5 can be built) |
63,000 or 1 (maximum 5 can be built) |
2x2 plot 6 hour build |
2x2 plot 4 hour build |
21 and 12 [I 1] | 19 and 11 [I 2] |
300 and 6,200 [I 3] | 240 and 7,000 [I 4] |
320 and 18 every 5 hours Coin per Minute: 1.07 XP per Minute: 0.06 [I 5] |
350 and 16 every 5 hours Coin per Minute: 1.17 XP per Minute: 0.05 [I 6] |
Can be sold for 15,400 | Can be sold for 12,600 |
- ↑ Before 12.16.2014, power was 16
- ↑ Before 12.16.2014, power was 14
- ↑ Before 12.16.2014, population limit was 14,700
- ↑ Before 12.16.2014, population limit was 10,600
- ↑ Before 12.16.2014, periodic reward was 900 per 5 hours
- ↑ Before 12.16.2014, periodic reward was 700 per 5 hours
Gold Mining Company (Level 2)[]
- Previously known as Gold Mining Corporation
Requires | Rewards |
---|---|
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Aluminum Profile | x 17 | 1 | 17 | |
Anchor Bolts | x 7 | 1 | 7 | |
Concrete Slabs | x 13 | 1 | 13 | |
Hydraulic Hammer | x 12 | 1 | 12 | |
Insulation | x 13 | 1 | 13 | |
Insulation Foam | x 13 | 1 | 13 | |
Plastic Panels | x 16 | 1 | 16 | |
Tiles | x 14 | 1 | 14 |
Trivia[]
- SQ Internal Info:
- Name: Золотодобывающая компания (translates to Gold Mining Company)
- ID: 10019154 (gold_mining_company_place)