Fandom

Megapolis Wiki

Montreal Business Center

2,547pages on
this wiki
Add New Page
Comments0 Share
This page relates to the new version of the Montreal Business Center. For old version, see Montreal Business Center.

The Montreal Business Center is a production structure located on the north corner of the Business Island. It was originally introduced on April 11, 2016 as part of the timed quest called Business Island.[1]

A total of 95 assets are needed to complete construction of the Montreal Business Center. This is equivalent to 105 Megabucks sm if one were to buy every asset instead of waiting to receive them from neighbors.


Gallery

Assets

Level 1 Montreal Business Center

No assets required

Level 2 Montreal Business Center

Asset Image Amount Price Cost
AsphaltAsset Asphalt 5xMegabucks smMegabucks sm
BitumenAsset Bitumen 10xMegabucks sm10 Megabucks sm
Tech DrawingAsset Tech Drawing 5xMegabucks smMegabucks sm
20 Assets 20 Megabucks sm

Level 3 Montreal Business Center

Asset Image Amount Price Cost
Air ExtractorAsset Air Extractor 10xMegabucks sm10 Megabucks sm
Duck Canvas
(a.k.a Tarpaulin)
Asset Duck Canvas 10xMegabucks sm10 Megabucks sm
InsulationAsset Insulation 5xMegabucks smMegabucks sm
Ventilation SystemAsset Ventilation System 10xMegabucks sm10 Megabucks sm
35 Assets 35 Megabucks sm

Level 4 Montreal Business Center

Asset Image Amount Price Cost
EscalatorsAsset Escalators 10xMegabucks sm10 Megabucks sm
Express ElevatorAsset Express Elevator 10xMegabucks sm20 Megabucks sm
Photoelectric DoorsAsset Photoelectric Doors 5xMegabucks smMegabucks sm
TurnstilesAsset Turnstiles 15xMegabucks sm15 Megabucks sm
40 Assets 50 Megabucks sm

Contracts

Level 1 Montreal Business Center

"Additional requirements for this contracts: Level 1 Financial Analysis Department & Level 1 Center of Investment"
Level 1 Montreal Business Center: Contracts
Name Cost Coin sm Time Reward Coin sm XP Experience sm Coins Coin sm/Minute XP Experience sm/Minute
Contract Stock Market Analysis (2)
Stock Market Analysis (I)[C 1]
600 Coin sm
+
1,350 Coin sm
4 hours 1,200 Coin sm
+
2,800 Coin sm
Experience sm
+
Experience sm
2.50 Coin sm
+
Coin sm
0.02 Experience sm
+
0.02 Experience sm
Contract Preparing Financial Rankings
Preparing Financial Rankings (I)[C 1]
1,050 Coin sm
+
2,450 Coin sm
8 hours 2,200 Coin sm
+
5,000 Coin sm
Experience sm
+
Experience sm
2.40 Coin sm
+
5.30 Coin sm
0.01 Experience sm
+
0.01 Experience sm
Contract Rating Financial Outlooks
Rating Financial Outlooks (I)[C 1]
2,050 Coin sm
+
4,800 Coin sm
19 hours 4,200 Coin sm
+
9,900 Coin sm
10 Experience sm
+
10 Experience sm
1.90 Coin sm
+
4.50 Coin sm
0.01 Experience sm
+
0.01 Experience sm
  1. 1.0 1.1 1.2 Top costs, rewards and experience are multiplied by up to 5 x Financial Analysis Department (Level 1 or 2);
    Bottom costs, rewards and experience are multiplied by up to 5 x Center of Investment (Level 1 or 2)

Level 2 Montreal Business Center

"Additional requirements for this contracts: Level 2 Financial Analysis Department & Level 1 Center of Investment"
Level 2 Montreal Business Center: Contracts
Name Cost Coin sm Time Reward Coin sm XP Experience sm Coins Coin sm/Minute XP Experience sm/Minute
Contract Stock Market Analysis (2)
Stock Market Analysis (II)[C 1]
850 Coin sm
+
2,000 Coin sm
4 hours and 30 minutes 1,900 Coin sm
+
4,500 Coin sm
Experience sm
+
Experience sm
3.90 Coin sm
+
9.30 Coin sm
0.03 Experience sm
+
0.03 Experience sm
Contract Preparing Financial Rankings
Preparing Financial Rankings (II)[C 1]
1,550 Coin sm
+
3,600 Coin sm
9 hours 3,500 Coin sm
+
8,200 Coin sm
14 Experience sm
+
14 Experience sm
3.60 Coin sm
+
8.50 Coin sm
0.03 Experience sm
+
0.03 Experience sm
Contract Rating Financial Outlooks
Rating Financial Outlooks (II)[C 1]
2,850 Coin sm
+
6,600 Coin sm
20 hours 6,500 Coin sm
+
15,000 Coin sm
20 Experience sm
+
20 Experience sm
Coin sm
+
Coin sm
0.02 Experience sm
+
0.02 Experience sm
  1. 1.0 1.1 1.2 Top costs, rewards and experience are multiplied by up to 5 x Financial Analysis Department (Level 2);
    Bottom costs, rewards and experience are multiplied by up to 5 x Center of Investment (Level 1 or 2)

Level 3 Montreal Business Center

"Additional requirements for this contracts: Level 2 Financial Analysis Department & Level 2 Center of Investment"
Level 3 Montreal Business Center: Contracts
Name Cost Coin sm Time Reward Coin sm XP Experience sm Coins Coin sm/Minute XP Experience sm/Minute
Contract Stock Market Analysis (2)
Stock Market Analysis (III)[C 1]
1,000 Coin sm
+
2,250 Coin sm
5 hours 2,600 Coin sm
+
5,800 Coin sm
15 Experience sm
+
15 Experience sm
5.30 Coin sm
+
11.80 Coin sm
0.05 Experience sm
+
0.05 Experience sm
Contract Preparing Financial Rankings
Preparing Financial Rankings (III)[C 1]
1,750 Coin sm
+
4,050 Coin sm
10 hours 4,500 Coin sm
+
10,500 Coin sm
23 Experience sm
+
23 Experience sm
4.60 Coin sm
+
10.80 Coin sm
0.04 Experience sm
+
0.04 Experience sm
Contract Rating Financial Outlooks
Rating Financial Outlooks (III)[C 1]
3,050 Coin sm
+
7,050 Coin sm
21 hours 7,900 Coin sm
+
18,200 Coin sm
32 Experience sm
+
32 Experience sm
3.80 Coin sm
+
8.80 Coin sm
0.03 Experience sm
+
0.03 Experience sm
  1. 1.0 1.1 1.2 Top costs, rewards and experience are multiplied by up to 5 x Financial Analysis Department (Level 2);
    Bottom costs, rewards and experience are multiplied by up to 5 x Center of Investment (Level 1 or 2)

Level 4 Montreal Business Center

"Additional requirements for this contracts: Level 2 Financial Analysis Department & Level 2 Center of Investment"
Level 4 Montreal Business Center: Contracts
Name Cost Coin sm Time Reward Coin sm XP Experience sm Coins Coin sm/Minute XP Experience sm/Minute
Contract Stock Market Analysis (2)
Stock Market Analysis (IV)[C 1]
1,150 Coin sm
+
2,650 Coin sm
5 hours and 30 minutes 3,500 Coin sm
+
8,200 Coin sm
22 Experience sm
+
22 Experience sm
7.10 Coin sm
+
16.80 Coin sm
0.07 Experience sm
+
0.07 Experience sm
Contract Preparing Financial Rankings
Preparing Financial Rankings (IV)[C 1]
2,050 Coin sm
+
4,750 Coin sm
11 hours 6,400 Coin sm
+
14,800 Coin sm
33 Experience sm
+
33 Experience sm
6.60 Coin sm
+
15.20 Coin sm
0.05 Experience sm
+
0.05 Experience sm
Contract Rating Financial Outlooks
Rating Financial Outlooks (IV)[C 1]
3,400 Coin sm
+
7,850 Coin sm
22 hours 10,600 Coin sm
+
24,500 Coin sm
44 Experience sm
+
44 Experience sm
5.50 Coin sm
+
12.60 Coin sm
0.03 Experience sm
+
0.03 Experience sm
  1. 1.0 1.1 1.2 Top costs, rewards and experience are multiplied by up to 5 x Financial Analysis Department (Level 2);
    Bottom costs, rewards and experience are multiplied by up to 5 x Center of Investment (Level 2)

Data

Level XP Population Limits Power Water Additional Access
0 250 Experience sm 5,000 Population Limits
(+5000)
10 Power sm
(+10)
Water sm
(+5)
  • Access to all Level 1 contracts above after completion of other contract requirements.
1 300 Experience sm 15,000 Population Limits
(+10000)
15 Power sm
(+5)
10 Water sm
(+5)
  • Access to all Level 2 contracts above after completion of other contract requirements.
2 400 Experience sm 35,000 Population Limits
(+20000)
20 Power sm
(+5)
15 Water sm
(+5)
  • Access to all Level 3 contracts above after completion of other contract requirements.
3 500 Experience sm 65,000 Population Limits
(+30000)
25 Power sm
(+5)
20 Water sm
(+5)
  • Access to all Level 4 contracts above after completion of other contract requirements.
Total/Max 1,450 Experience sm 65,000 Population Limits 25 Power sm 20 Water sm

Trivia

SQ Internal Info:
  • Name: Бизнес-центр "Монреаль" (translates to Business Centre "Montreal")
  • ID: 13610 (business_centre_montreal_place)

References

  1. SQ Forum: Update 04.11.2016 #1

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.