FANDOM


Quest The Power of the Sun
 → 
Quest Scientific Knowledge
 → 
Quest Solar Farm (Quest)
 → 
Quest First Upgrades
 → 
Quest Energy Research Institute
 → 
Quest New Solar Cells
 → 
Quest New Power Installations
The Power of the SunScientific KnowledgeSolar Farm (Quest)First UpgradesEnergy Research InstituteNew Solar CellsNew Power Installations


Requirements

The New Solar Cells quest unlocks once the following conditions have been met:

Goals

Copy the quest description to here
Production Complex Upgrade your Production Laboratories to Production Complexes (2 of 2)
Costs: 15 assets or 20 Megabucks sm, 5 Power sm and 3 Water sm each
5 x Measure and Control Systems Asset Measure and Control Systems
5 x Facing Plates Asset Facing Plates
5 x Sound Insulation Asset Sound Insulation
Gives: 500 Experience sm and 5,000 Population Limits cap increase upon completion and access to upgrade Additional Modules (Level 1) to Additional Power Installations (Level 2) at the Solar Farm
Contract Thin-Film Solar Cells Start a Thin-Film Solar Cells contract at the Power Engineering Institute
Requires: Energy Research Institute (Level 2)
Costs: 8,000 Coin sm and 14 hours (contract does not need to be completed)
Gives: 26,000 Coin sm and 170 Experience sm upon completion
80px Start building another Additional Module (purchase 2nd foundation) at the Solar Farm
Costs: 300,000 Coin sm or 2 Megabucks sm, 5 Water sm
Gives: 500 Experience sm and 2,500 Population Limits cap increase

Rewards

Congratulations! The new solar cells represent a real breakthrough in solar power. Would you like to tell yoru friends about it?
  • XP Reward: 290 Experience sm
  • Coin Reward: 5,500 Coin sm


Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.