FANDOM


Under Construction This article is incomplete. Please help improve it by adding or editing the following items:
  • Quest message text: task list text
Quest The Study of Water  →  Quest Preliminary Research  →  Quest Practical Trials  →  Quest Applied Hydrology  →  Quest Hydrology Research Institute  →  Quest Conserving Energy  →  Quest Turbine Upgrade
The Study of Water Preliminary Research Practical Trials Applied Hydrology Hydrology Research Institute Conserving Energy Turbine Upgrade


Requirements

The Preliminary Research quest unlocks once the following conditions have been met:

Goals

Copy the quest description to here
Hydrology Institute L1 Finish building the Hydrology Institute (Level 1)
Costs: 30 Assets or 30 Megabucks sm, 5 Power sm and 0 Water sm
Gives: 550 Experience sm and 10,000 Population sm cap increase
Water Facility Construction Buy a Water Facility Foundation
Costs: 220,000 Coin sm or 3 Megabucks sm, 10 Power sm and 0 Water sm
Gives: 500 Experience sm and 5,000 Population sm cap increase

Rewards

Congratulations! The Hydrology Institute is complete and our scientists are getting down to work. The next step: putting theory into practice with a Water Facility! Would you like to tell your friends about it?
  • XP Reward: 150 Experience sm
  • Coin Reward: 1,500 Coin sm

Trivia

  • Social Quantum's ID for this quest is 70376.

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.