FANDOM



The Project Administration Office is a production structure located on the bank of oasis south-east of Overpass Expansion Zone. It was originally introduced on October 06, 2015 as part of the timed quest called Desert Oasis.[1]

A total of 105 assets are needed to complete construction of the Project Administration Office. This is equivalent to 105 Megabucks sm if one were to buy every asset instead of waiting to receive them from neighbors.


Gallery

Assets

Project Administration Office (Level 1)

Asset Image Amount Price Cost
CurbAsset Curb 5x1 Megabucks sm5 Megabucks sm
Luminescent LampsAsset Luminescent Lamps 5x1 Megabucks sm5 Megabucks sm
10 Assets 10 Megabucks sm

Project Administration Office: Project Headquarters (Level 2)

Asset Image Amount Price Cost
Aluminum ProfileAsset Aluminum Profile 12x1 Megabucks sm12 Megabucks sm
Anchor BoltsAsset Anchor Bolts 10x1 Megabucks sm10 Megabucks sm
Border TapeAsset Border Tape 13x1 Megabucks sm13 Megabucks sm
CordsAsset Cords 8x1 Megabucks sm8 Megabucks sm
GeotextilesAsset Geotextiles 7x1 Megabucks sm7 Megabucks sm
NailsAsset Nails 14x1 Megabucks sm14 Megabucks sm
Plastic PanelsAsset Plastic Panels 9x1 Megabucks sm9 Megabucks sm
Polymer PipesAsset Polymer Pipes 11x1 Megabucks sm11 Megabucks sm
ToolsAsset Tools 11x1 Megabucks sm11 Megabucks sm
95 Assets 95 Megabucks sm

Contracts

Project Administration Office: Contracts
NameCostCoin smDurationRewardCoin smXPExperience smCoinsCoin sm/MinuteXPExperience sm/MinuteRequirements
Contract Water Sampling
Water Sampling
160 Coin sm15 minutes720 Coin sm7 Experience sm37.33 Coin sm0.47 Experience smProject Administration Office
Contract Researching the Oasis Ecosystem
Researching the Oasis Ecosystem
320 Coin sm30 minutes1,400 Coin sm14 Experience sm36.00 Coin sm0.47 Experience smReservoir Research Center
Contract Designing a Water Supply System
Designing a Water Supply System
1,000 Coin sm1 hour4,500 Coin sm47 Experience sm58.33 Coin sm0.78 Experience smSolar Cooling Facility
Contract Starting Up the Irrigation System
Starting Up the Irrigation System
4,950 Coin sm3 hours21,500 Coin sm190 Experience sm91.94 Coin sm1.06 Experience smIrrigation System
Contract Project Conference
Project Conference[C 1]
7,730 Coin sm5 hours33,600 Coin sm320 Experience sm86.23 Coin sm1.07 Experience smDepartment of Water Bioresources
Contract Project Commercialization
Project Commercialization
14,200 Coin sm7 hours61,800 Coin sm550 Experience sm113.33 Coin sm1.31 Experience smClimate Control Department
Contract Remote Water Supply
Remote Water Supply[C 2]
17,270 Coin sm8 hours75,100 Coin sm690 Experience sm120.48 Coin sm1.44 Experience smProject Headquarters
Contract Oasis Camel Tour
Oasis Camel Tour
23,000 Coin sm10 hours100,000 Coin sm1,000 Experience sm128.33 Coin sm1.67 Experience smDesert Tears Moisture Collector

  1. Special Contract: 4 friends may assist, increasing reward by 400 Coin sm each; they receive 400 Coin sm each.
  2. Special Contract: 6 friends may assist, increasing reward by 600 Coin sm each; they receive 600 Coin sm each.

Data

LevelPopulation LimitsXPPowerWaterAdditional Access
Level 05,000 Population Limits (+5,000)100 Experience sm (+100)10 Power sm (+10)10 Water sm (+10)
Level 111,000 Population Limits (+6,000)300 Experience sm (+200)30 Power sm (+20)30 Water sm (+20)
  • Access to Water Sampling contract
Level 219,000 Population Limits (+8,000)700 Experience sm (+400)80 Power sm (+50)80 Water sm (+50)
  • Access to Remote Water Supply contract
Total/Max19,000 Population Limits1,100 Experience sm80 Power sm80 Water sm

Trivia

SQ Internal Info:
  • Name: Администрация проекта (translates to Administration of the project)
  • ID: 10020057 (project_administration_place)

References

  1. SQ Forum: Update 10.06.2015