FANDOM



The Project Administration Office is a production structure located on the bank of oasis south-east of Overpass Expansion Zone. It was originally introduced on October 06, 2015 as part of the timed quest called Desert Oasis.[1]

A total of 105 assets are needed to complete construction of the Project Administration Office. This is equivalent to 105 Megabucks sm if one were to buy every asset instead of waiting to receive them from neighbors.


Gallery

Assets

Project Administration Office (Level 1)

Asset Image Amount Price Cost
CurbAsset Curb 5x1 Megabucks sm5 Megabucks sm
Luminescent LampsAsset Luminescent Lamps 5x1 Megabucks sm5 Megabucks sm
10 Assets 10 Megabucks sm

Project Administration Office: Project Headquarters (Level 2)

Asset Image Amount Price Cost
Aluminum ProfileAsset Aluminum Profile 12x1 Megabucks sm12 Megabucks sm
Anchor BoltsAsset Anchor Bolts 10x1 Megabucks sm10 Megabucks sm
Border TapeAsset Border Tape 13x1 Megabucks sm13 Megabucks sm
CordsAsset Cords 8x1 Megabucks sm8 Megabucks sm
GeotextilesAsset Geotextiles 7x1 Megabucks sm7 Megabucks sm
NailsAsset Nails 14x1 Megabucks sm14 Megabucks sm
Plastic PanelsAsset Plastic Panels 9x1 Megabucks sm9 Megabucks sm
Polymer PipesAsset Polymer Pipes 11x1 Megabucks sm11 Megabucks sm
ToolsAsset Tools 11x1 Megabucks sm11 Megabucks sm
95 Assets 95 Megabucks sm

Contracts

Project Administration Office: Contracts
Name Cost Coin sm Time Reward Coin sm XP Experience sm Coins Coin sm/Minute XP Experience sm/Minute Requirements
Contract Water Sampling
Water Sampling
160 Coin sm 15 minutes 720 Coin sm 7 Experience sm 37.30 Coin sm 0.50 Experience sm Project Administration Office
Contract Researching the Oasis Ecosystem
Researching the Oasis Ecosystem
320 Coin sm 30 minutes 1,400 Coin sm 14 Experience sm 36 Coin sm 0.50 Experience sm Reservoir Research Center
Contract Designing a Water Supply System
Designing a Water Supply System
1,000 Coin sm 1 hour 4,500 Coin sm 47 Experience sm 58.30 Coin sm 0.80 Experience sm Solar Cooling Facility
Contract Starting Up the Irrigation System
Starting Up the Irrigation System
4,950 Coin sm 3 hours 21,500 Coin sm 190 Experience sm 91.90 Coin sm 1.10 Experience sm Irrigation System
Contract Project Conference
Project Conference[C 1]
7,730 Coin sm 5 hours 33,600 Coin sm 320 Experience sm 86.20 Coin sm 1.10 Experience sm Department of Water Bioresources
Contract Project Commercialization
Project Commercialization
14,200 Coin sm 7 hours 61,800 Coin sm 550 Experience sm 113.30 Coin sm 1.30 Experience sm Climate Control Department
Contract Remote Water Supply
Remote Water Supply[C 2]
17,270 Coin sm 8 hours 75,100 Coin sm 690 Experience sm 120.50 Coin sm 1.40 Experience sm Project Headquarters
Contract Oasis Camel Tour
Oasis Camel Tour
23,000 Coin sm 10 hours 100,000 Coin sm 1,000 Experience sm 128.30 Coin sm 1.70 Experience sm Desert Tears Moisture Collector
  1. Special Contract: 4 friends may assist, increasing reward by 400 Coin sm each; they receive 400 Coin sm each.
  2. Special Contract: 6 friends may assist, increasing reward by 600 Coin sm each; they receive 600 Coin sm each.

Data

Level XP Population Limits Power Water Additional Access
0 100 Experience sm 5,000 Population Limits
(+5000)
10 Power sm
(+10)
10 Water sm
(+10)
1 300 Experience sm 11,000 Population Limits
(+6000)
30 Power sm
(+20)
30 Water sm
(+20)
  • Access to Water Sampling contract
2 700 Experience sm 19,000 Population Limits
(+8000)
80 Power sm
(+50)
80 Water sm
(+50)
  • Access to Remote Water Supply contract
Total/Max 1,100 Experience sm 19,000 Population Limits 80 Power sm 80 Water sm

Trivia

SQ Internal Info:
  • Name: Администрация проекта (translates to Administration of the project)
  • ID: 10020057 (project_administration_place)

References

  1. SQ Forum: Update 10.06.2015

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.