"Build the Stone Tunnel Exit so drivers can get where they need to go even faster."
The Stone Tunnel is a road tunnel that runs through a hill south-east of Overpass expansion zone. It was originally introduced on Fri September 25, 2015 as part of the timed quest called Ring Road.[1]
A total of 110 assets and additional 500,000 worth diagrams are needed to complete construction of both parts of Stone Tunnel. This is equivalent to 110 if one were to buy every asset instead of waiting to receive them from neighbors.
Gallery[]
Assets[]
Stone Tunnel (Entrance)[]
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Detailed Diagram | 1x | 250,000 | 250,000 | |
Iron Beams | 5x | 1 | 5 | |
Mixed Concrete | 7x | 1 | 7 | |
Bitumen | 6x | 1 | 6 | |
Marine Fuel | 7x | 1 | 7 | |
Stone Blocks | 10x | 1 | 10 | |
Lighting Equipment | 8x | 1 | 8 | |
Hard Hat | 7x | 1 | 7 | |
Breaker | 5x | 1 | 5 | |
55 Assets 1 Diagram |
55 250,000 |
Stone Tunnel (Exit)[]
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Detailed Diagram | 1x | 250,000 | 250,000 | |
Iron Beams | 5x | 1 | 5 | |
Mixed Concrete | 7x | 1 | 7 | |
Bitumen | 6x | 1 | 6 | |
Pipe Cutter | 7x | 1 | 7 | |
Stone Blocks | 10x | 1 | 10 | |
Lighting Equipment | 8x | 1 | 8 | |
Hard Hat | 7x | 1 | 7 | |
Breaker | 5x | 1 | 5 | |
55 Assets 1 Diagram |
55 250,000 |
Data (for both Entrance and Exit)[]
Level | XP | Population Limits | Power | Water |
---|---|---|---|---|
0 | 400 | — | (+—) |
(+—) |
1 | 600 | — | (+0) |
(+0) |
Total/Max | 1,000 |
Trivia[]
- SQ Internal Info:
- Name: Вход в Каменный тоннель (translates to Entrance to the stone tunnel)
- ID: 2000060 (beltway_stone_tunnel_entry_place)