Quest A New Form of Public Transportation
Quest Underground Transportation
Quest First Train
Quest Delivering Passengers
Quest Repairs and Preventive Maintenance
Quest One More Station
Quest Modernized Train
Quest Surface Subway Station (Quest)
Quest New Subway Stations
Quest Upgraded Train
Quest A Perfect Form of Transportation
Quest Depot with the Best Trains
A New Form of Public TransportationUnderground TransportationFirst TrainDelivering PassengersRepairs and Preventive MaintenanceOne More StationModernized TrainSurface Subway Station (Quest)New Subway StationsUpgraded TrainA Perfect Form of TransportationDepot with the Best Trains


The Upgraded Train quest unlocks once the following conditions have been met:

  • Level ??


Keep upgrading the subway and build the maximum number of stations!
Underground Subway Station L2 Build an Underground Subway Terminal (Level 2) (2 of 3)
Costs: 7 assets or 7 Megabucks sm, 13 Power sm and 12 Water sm
2 x Glass Asset Glass
1 x Rebar Asset Rebar
4 x Aluminum Profile Asset Aluminum Profile
Gives: 450 Experience sm and 8,000 Population Limits cap increase
Subway Train L3 Build Subway Train (Los Angeles) (Level 3)
Costs: 25 assets or 25 Megabucks sm, Power sm and Water sm
10 x Coupling Asset Coupling
10 x Brake Pads Asset Brake Pads
5 x Carriage Lining Asset Carriage Lining
Gives: Access to Los Angeles Train Contracts (IV)
Contract Workday Schedule (IV) Complete four runs on the Workday Schedule (IV) (contract at the Subway Train (Los Angeles)):Costs: 2,200 Coin sm and 6 hours each:Gives: 7,480 Coin sm and 32 Experience sm each upon completion


Great job! It won't be long before the subway system is complete and ready to start turning a steady profit.
  • XP Reward: 230 Experience sm
  • Coin Reward: 9,300 Coin sm


  • Social Quantum's ID for this quest is 70620.